Iona Island WWTP
CLIENT
Metro Vancouver
LOCATION
British Columbia
DELIVERY MODEL
Design-Bid-Build
PRIME CONSULTANT
Jacobs
SECTOR
Environmental, Water & Wastewater
PROJECT VALUE
$23.8 million
COMPLETION DATE
June 2017
Project Overview
This upgrade project constructed a primary sludge screening and degritting facility, a primary sludge thickener and pump building, an odour control system, and other related work. Due to its proximity to the Fraser River, the project team implemented several environmental protection measures throughout the construction period.
The project also involved soil densification, dewatering, excavation, site services, building mechanical installations, electrical distribution, instrumentation, and control systems. Interconnecting piping between the new and existing facilities’ mechanical, electrical, and other support systems was required. Coordination with other contractors and plant operators was a critical element of the project.
An aggressive schedule was set for the removal of 27,000 m³ of preload sand and the installation of approximately 4,900 timber piles to achieve the design soil densification before construction began. We used a deep well dewatering system to facilitate the construction of utilities and deep foundations.