Erindale GO Station
CLIENT
Metrolinx
LOCATION
Ontario
DELIVERY MODEL
Design-Build
PRIME CONSULTANT
Parsons
SECTOR
Parking Structures | Transportation
PROJECT VALUE
$74.6 million
COMPLETION DATE
October 2013
Project Overview
This Kenaidan-led design-build project provides a parking structure, ticketing office, platform access via a link bridge, and several surface lot improvements for GO patrons. We obtained design services from Read Jones Christoffersen and IBI Group.
The garage is a 6-level post-tensioned cast-in-place concrete structure landmarked by a central stair tower. An enclosed pedestrian bridge, platform stair and elevator provide connectivity between the garage and the platform.
The surface lot was constructed in phases, providing a new pick-up and drop-off area, surface parking, and LED lighting. The project, designed and built to LEED standards, achieved LEED Silver certification; one of the requirements targeted the façade to be both durable and complimentary to its neighbours.
This project received the 2013 Ontario Concrete Award – Specialty Concrete Applications, the 2014 International Parking Institute’s (IPI) Award of Merit and the 2014 City of Mississauga Urban Design Award of Merit.
Project Photos
(Showing 5 of 9 Images)
